Frequently Asked Questions

At Pulse Electrix Ltd, we specialise in providing safe, reliable, and compliant temporary electrical site supplies for construction sites, events, and temporary setups. Below are some of the most commonly asked questions about our temporary power solutions. If you have any other queries, feel free to reach out to us!

+

What is temporary electrical site supply?

Temporary electrical site supply provides power to construction sites, outdoor events, and temporary setups where a permanent connection is not available. It includes the installation of distribution boards, generator connections, and safe cabling to ensure a reliable power source.

+

What regulations apply to temporary site electrics?

Temporary electrical installations must comply with BS 7671:2018 (18th Edition Wiring Regulations) and the Electricity at Work Regulations 1989. All installations must be safe, regularly inspected, and maintained to prevent electrical hazards.

+

How is temporary power supplied to a site?

Power can be supplied via mains connection (if available), generators, or battery storage systems. We install distribution boards and ensure safe cable management to power cabins, lighting, tools, and machinery.

+

How often should temporary site electrics be inspected?

Temporary electrical systems should be inspected at least every 3 months or as specified by site requirements. Regular inspections help prevent faults, ensure compliance, and maintain safety.

+

What safety measures should be in place for site electrics?

All electrical components should be weatherproof, RCD protected, and properly earthed. Cables should be routed safely to avoid trip hazards, and regular inspections must be carried out by qualified electricians.